

Materials will be cleaned
|
Surface materials
|
Consumption of sand
Amended powered turbine engines operating at full capacity in an hour as a result of the KPS. ball in terms of consumption.
|
|||||
7
14
|
11
21
|
15
28
|
18
35
|
22
42
|
37 KW
70 AM
|
||
Steel Casting
Sand Removal
Oxide Removal
|
Clean, no sand
Clean oxide-free
|
-
-
|
3
3
|
4
4
|
4,5-5,5
4,5-5,5
|
5-6
5-6
|
8-10
8-10
|
Gray Cast Iron
Sand Combustion
Heavy sandy
Normal Parts
Smithereens
|
Fresh Processed
Clean, no sand
Clean, no sand
Clean, no sand
|
-
2,5-3,5
2-2,5
1,5-2
|
-
3-4
2-3
1,5-2,5
|
4,5
4,5
2,5-3,5
2-3
|
5-6
5-6
3,5-4,5
4-5
|
6-7
6-7
4,5-5,5
4-5
|
8-10
8-10
-
-
|
Malleable cast iron
Normal
Thin
|
Clean, oxide-free
Clean, oxide-free
|
2-2,5
1,5-2
|
2-3
1,5-2,5
|
2,5-3,5
2-3
|
3-4
2,5-3,5
|
3,5-4,5
-
|
-
-
|
Heavy Metal Castings
|
Temiz Kumsuz
|
1,5-2,5
|
2-3
|
2-3,5
|
2,5-4
|
-
|
-
|
Forged Parts
Large
Medium
Thin
|
Clean, oxide-free
Clean, oxide-free
Clean, oxide-free
|
2,5-3,5
1,5-2,5
1-2
|
3-4
2-3
1,5-2,5
|
4-5
2,5-3,5
2-3
|
5-6
3-4
2,5-3,5
|
6-7
3,5-4,5
-
|
8-10
-
-
|
Hardened Parts
Slab ingots
Log in
|
Clean, oxide-free
Oxide has been good to go
|
2,5-3,5
1,5-2,5
1-2
|
3-4
2-3
1,5-2,5
|
4-5
2,5-3,5
2-3
|
5-6
3-4
2,5-3,5
|
6-7
3,5-4,5
-
|
8-10
-
-
|
Steel Rods
Thin profiles
Wire
|
Shiny metallic
Shiny metallic
Shiny metallic
|
1
1
1
|
1-1,5
1-1,5
1-1,5
|
1,5-2
1,5-2
1,5-2
|
2-2,5
2-2,5
2-2,5
|
2,5-3,5
2,5-3,5
2,5-3,5
|
-
-
4-6
|
Steel Strip
Wire Strip
Stainless Steel Strip
|
Shiny metallic
Shiny metallic
|
1
1
|
1-1,5
1-1,5
|
1,5-2
1,5-2
|
2-2,5
2-2,5
|
2,5-3
2,5-3
|
3-5
3-5
|
Ship Plates
Steel Construction
Mountains are D.D.
Steel sheet is the mountain
|
Sa 2,5- Sa 3
Sa 2,5- Sa 3
Shiny metallic
Shiny metallic
|
1
1
1,5-2,5
1-2
|
1,5-2,5
1,5-2,5
2-3
1,5-2,5
|
2-3
2-3
2,5-3,5
2-3
|
2,5-3,5
2,5-3,5
3-4
2,5-3,5
|
3-4
3-4
3,5-4,5
-
|
5-7
5-7
-
-
|